Federal Railroad Administration Federal Grants
Showing results
51-74 of 74 for Federal Railroad Administration federal grants, government grants and loans. For detailed information on a Federal Railroad Administration federal grant including eligibility requirements or financial assistance, click the title.
The Passenger Rail Investment and Improvement Act of 2008 (PRIIA) Section 212 requires establishment of a Northeast Corridor Infrastructure and Operations Advisory Commission (NEC Commission). The NEC Commission was established ?to promote mutual...
www.FederalGrantsWire.com/fy11-12--13---northeast-...
The roadway surface will be widened from two lanes to four lanes at railroad crossing 522663Y, rail mile post KH-0.21, (NS project 05.1604) located approximately 225? south of State Street and approximately 350? north of Middlebury Street. At this...
www.FederalGrantsWire.com/fy08-elkhart-rail-line-r...
The study (Congressionally mandated) shall address and make recommendations on?(1) the performance of the Nation?s major railroads regarding service levels, service quality, and rates; (2) the projected demand for freight transportation over the...
www.FederalGrantsWire.com/fy13-study-of-rail-trans...
The proposed project is for the Greater Ouachita Port Commission (GOPC) which is a political subdivision of the State of Louisiana. The port facility is located at the intersection of Coleman Avenue and Valley Road in West Monroe, Louisiana. The...
www.FederalGrantsWire.com/fy10-rail-spur-extension...
To provide program funding for Operation Lifesaver, Inc., using funds designed and provided under the approved budget for the Federal railroad Administration's Office of Safety for fiscal year 2013 to administer the Law Enforcement Liaison program.
www.FederalGrantsWire.com/fy13-law-enforcement-lia...
To provide program funding for Operation Lifesaver, Inc., using funds designed and provided under the approved budget for the Federal railroad Administration's Office of Safety for fiscal year 2013.
www.FederalGrantsWire.com/fy13-oli-highway-railroa...
Norfolk Southern Corporation will complete extensive testing, modeling and initial integration of a string of Li-NMC battery cells packaged by Corvus Energy. Testing will include both switching cycles and line-of-road test protocols featuring...
www.FederalGrantsWire.com/fy13-hybrid-road-locomot...
The purpose of the research is: 1. Develop a novel technique to allow for continuous welding of two rail sections. 2. Perform welding on various sections of pearlitic rail steels with different weld geometry and filler materials. ...
www.FederalGrantsWire.com/fy13-development-and-eva...
he purpose of this grant amendment is to improve the non-contact rail inspection system that has been developed by the University of California, San Diego (UCSD) under the completed FRA R&D grants DTFR53-02-G-00011 and FR-RRD-0001-10-01-00. The...
www.FederalGrantsWire.com/fy13-rail-defect-detecti...
Provide a grant to the American Public Transportation Association (APTA) for the purposes of soliciting contractor support for the conduct of a Preliminary Hazard Analysis, an Operating and Support Hazard Analysis, a Safety Traceability Matrix and a...
www.FederalGrantsWire.com/fy13-safety-analysis-of-...
The Project includes repair of 6,600 linear feet of rail spur at the Crossroads of America Industrial Park in Greene County, Alabama to support an increase in train traffic within the park. Repairs consist of replacement of every other cross tie in...
www.FederalGrantsWire.com/fy12-crossroads-of-ameri...
Pursuant to the Disaster Relief Appropriations Act, 2013 (Public Law No. 113-2, January 29, 2013) the National Passenger Railroad Corporation (Amtrak) is eligible to receive up to $185,000,000 in support of efforts to improve resiliency and mitigate...
www.FederalGrantsWire.com/fy-2013-hudson-yards-res...
Research the feasibility of an on-board monitoring system for freight cars in order to improve rail safety by detecting components that are potential imminent failures that may cause derailments and train delays. For the fourth phase of the...
www.FederalGrantsWire.com/fy13-continuation-of-wir...
Hazmat Transportation Analytical Risk Model (H-TRAM)development of a Threat, Vulnerability, Consequence (TVC) based risk assessment tool to be used for rail corridor routing of PIH/TIH materials.
www.FederalGrantsWire.com/fy13-supplemental-for-ra...
The FRA Office of R&D and the NRC wish to continue cooperative research to continue to improve safety and productivity of rail services in North America through this Project by studying friction, Rolling contact Fatigue, and wear in rail and wheel.
www.FederalGrantsWire.com/fy13---rrd---studies-of-...
The Grantee will replace or cause to be replaced, the southern mid-river draw rest of the Hoquiam River Bridge with a draw dolphin in order to maintain rail access to businesses and industrial parcels located west of the Hoquiam River and along the...
www.FederalGrantsWire.com/fy10-hoquiam-horn-spur-r...
The Project includes repair of 6,600 linear feet of rail spur at the Crossroads of America Industrial Park in Greene County, Alabama to support an increase in train traffic within the park. Repairs consist of replacement of every other cross tie in...
www.FederalGrantsWire.com/fy10-crossroads-of-ameri...
The Springfield Study investigated the potential consolidation of all or a portion of the following rail corridors (all located in Springfield, Illinois): the Union Pacific Railroad tracks along Third Street; the Norfolk Southern Railroad tracks on...
www.FederalGrantsWire.com/fy10-springfield-rail-re...
The Illinois Commerce Commission (ICC) will utilize funds for the Rail Line Relocation Program to provide grants to communities in Illinois that have been impacted by the Canadian National Railway Company (CN) acquisition of the Elgin, Joliet &...
www.FederalGrantsWire.com/fy10-railroad-highway-gr...
Congress has designated funding to the Federal Highway Administration (FHWA) under the Surface Transportation Priorities for the ?East Texas Higher Speed Rail Feasibility Study? for intercity passenger rail corridor between the Dallas-Fort Worth...
www.FederalGrantsWire.com/fy08-fhwa-surface-transp...
In the Transportation Equity Act for the 21st Century, Congress appropriated $5 million ($4,690,857 after rescission) to conduct a study of the transportation alternatives between Atlanta and Chattanooga. Those funds required a 20% match and were...
www.FederalGrantsWire.com/fy1998--2004---atlanta-c...
In phase ii of this project, based on the results from the phase I, a scaled model of the roller rig will be designed and fabricated. The roller rig can be used to study the wheel /rail contact conditions and provide the means for measuring...
www.FederalGrantsWire.com/evaluation-of-wheelrail-...
To promote safety in all areas of railroad operations; reduce railroad related accidents and casualties; and to reduce damage to property caused by accidents involving any carrier of hazardous materials by providing State participation in the...
www.FederalGrantsWire.com/grantsinaid-for-railroad...
To stimulate the implementation of High Speed Passenger Rail Systems.
www.FederalGrantsWire.com/high-speed-ground-transp...