The Town of Provincetown: Race Point/MacMillan Pier Bicycle Connection

 

This is not a request for solicitation. This is an announcement that the Town of Provincetown has entered into a cooperative agreement with the NPS to: 1. Develop project concepts and design alternatives, including safety and wayfinding signage, sharrows, bike lane and crosswalk groundmarkings, crossing aids, and pavement and shoulder improvements. 2. Perform surveying and any other on-site data collection necessary for project design. 3. Analyze traffic conditions and public right-of-way availability to inform project design. 4. Develop design drawings and other technical documents (maps, illustrations) to be used for internal and public review. 5. Prepare and deliver presentations to the public, including but not limited to presentations to the Provincetown Board of Selectmen and Provincetown Bicycle Committee. 6. Provide space for public meetings. 7. Provide materials (notices, posters, handouts, PowerPoints) for public meetings. 8. Perform outreach to ensure robust involvement in public involvement. 9. Develop final project design. 10. Coordinate all necessary permitting, including Massachusetts Department of Transportation requirements. 11. Coordinate the construction elements of the project. 12. Provide detailed spending plan for approval to NPS. 13. Widen Conwell Street, remove encroaching vegetation and add pavement markings, including sharrows and bike lane striping from Cemetery Road to start of the turn lane from Conwell Street to Route 6 west-bound. See Appendix B for map and Appendix A and pictures. 14. Install signage on Conwell Street at the intersection with Route 6 to clearly communicate the transition from bike lanes to a bike route. 15. Install signage, above and beyond the MUTCD standards, in the vicinity of the Cemetery Road/Conwell Street intersection, and in the curve just north of the intersection, to increase safety at the crosswalk. 16. Install signage on Conwell Street south-bound to guide bicyclists onto Cemetery Road. 17. Replace manhole covers and catch basin grates along route with bicycle-friendly versions. 18. Repair and fill in any gaps in paving along road shoulders at intersections to provide continuous uninterrupted paved bike lanes. 19. Relocate existing signs and structures as necessary to provide clear bike lanes.

General information about this opportunity
Last Known Status
Deleted 08/02/2014 (Archived.)
Program Number
NPS-14-NERO-0099
Federal Agency/Office
Agency: Department of the Interior
Office: National Park Service
Type(s) of Assistance Offered
Cooperative Agreement
Number of Awards Available
1
Other Categories
This is not a request for solicitation. This is an announcement that the Town of Provincetown has entered into a cooperative agreement with the NPS to: 1. Develop project concepts and design alternatives, including safety and wayfinding signage, sharrows, bike lane and crosswalk groundmarkings, crossing aids, and pavement and shoulder improvements. 2. Perform surveying and any other on-site data collection necessary for project design. 3. Analyze traffic conditions and public right-of-way availability to inform project design. 4. Develop design drawings and other technical documents (maps, illustrations) to be used for internal and public review. 5. Prepare and deliver presentations to the public, including but not limited to presentations to the Provincetown Board of Selectmen and Provincetown Bicycle Committee. 6. Provide space for public meetings. 7. Provide materials (notices, posters, handouts, PowerPoints) for public meetings. 8. Perform outreach to ensure robust involvement in public involvement. 9. Develop final project design. 10. Coordinate all necessary permitting, including Massachusetts Department of Transportation requirements. 11. Coordinate the construction elements of the project. 12. Provide detailed spending plan for approval to NPS. 13. Widen Conwell Street, remove encroaching vegetation and add pavement markings, including sharrows and bike lane striping from Cemetery Road to start of the turn lane from Conwell Street to Route 6 west-bound. See Appendix B for map and Appendix A and pictures. 14. Install signage on Conwell Street at the intersection with Route 6 to clearly communicate the transition from bike lanes to a bike route. 15. Install signage, above and beyond the MUTCD standards, in the vicinity of the Cemetery Road/Conwell Street intersection, and in the curve just north of the intersection, to increase safety at the crosswalk. 16. Install signage on Conwell Street south-bound to guide bicyclists onto Cemetery Road. 17. Replace manhole covers and catch basin grates along route with bicycle-friendly versions. 18. Repair and fill in any gaps in paving along road shoulders at intersections to provide continuous uninterrupted paved bike lanes. 19. Relocate existing signs and structures as necessary to provide clear bike lanes.
Who is eligible to apply/benefit from this assistance?
Applicant Eligibility
This is not a request for solicitation. This is an announcement that the Town of Provincetown has entered into a cooperative agreement with the NPS to: 1. Develop project concepts and design alternatives, including safety and wayfinding signage, sharrows, bike lane and crosswalk groundmarkings, crossing aids, and pavement and shoulder improvements. 2. Perform surveying and any other on-site data collection necessary for project design. 3. Analyze traffic conditions and public right-of-way availability to inform project design. 4. Develop design drawings and other technical documents (maps, illustrations) to be used for internal and public review. 5. Prepare and deliver presentations to the public, including but not limited to presentations to the Provincetown Board of Selectmen and Provincetown Bicycle Committee. 6. Provide space for public meetings. 7. Provide materials (notices, posters, handouts, PowerPoints) for public meetings. 8. Perform outreach to ensure robust involvement in public involvement. 9. Develop final project design. 10. Coordinate all necessary permitting, including Massachusetts Department of Transportation requirements. 11. Coordinate the construction elements of the project. 12. Provide detailed spending plan for approval to NPS. 13. Widen Conwell Street, remove encroaching vegetation and add pavement markings, including sharrows and bike lane striping from Cemetery Road to start of the turn lane from Conwell Street to Route 6 west-bound. See Appendix B for map and Appendix A and pictures. 14. Install signage on Conwell Street at the intersection with Route 6 to clearly communicate the transition from bike lanes to a bike route. 15. Install signage, above and beyond the MUTCD standards, in the vicinity of the Cemetery Road/Conwell Street intersection, and in the curve just north of the intersection, to increase safety at the crosswalk. 16. Install signage on Conwell Street south-bound to guide bicyclists onto Cemetery Road. 17. Replace manhole covers and catch basin grates along route with bicycle-friendly versions. 18. Repair and fill in any gaps in paving along road shoulders at intersections to provide continuous uninterrupted paved bike lanes. 19. Relocate existing signs and structures as necessary to provide clear bike lanes.
What is the process for applying and being award this assistance?
Application Procedure
This is not a request for solicitation. This is an announcement that the Town of Provincetown has entered into a cooperative agreement with the NPS to: 1. Develop project concepts and design alternatives, including safety and wayfinding signage, sh
Deadlines
08/01/2014
Other Assistance Considerations
Formula and Matching Requirements
This program does not have cost sharing or matching requirements.
Who do I contact about this opportunity?
Headquarters Office
Keith Zotti
Partnership Program Specialist
Phone 2155979153
E-mail Address
keith_zotti@nps.gov
Financial Information
Obligations
$119,600.00
Range and Average of Financial Assistance
Awards range from $119,600.00 to $119,600.00

 


Related Federal Grants


Federal Grants Resources